The Baylor Facility Services Department manages and coordinates the construction, renovation and repair projects of outside subcontractors and our own skilled trade shops. We are to ensure quality construction projects, manage the schedules, budgets, payments, and required testing and inspections related to these projects. In addition, we oversee the subcontractor performance for compliance with construction documents, the approved schedule, quality of workmanship, quality and quantity of materials, and construction industry standards in which they are providing a service. We also have the task of maintaining the BFS project files and records related to those construction projects.

All Qualified Bidders will receive instructions to bid on projects. The instructions include at a minimum:

1. Project Description
2. Building Name
3. Project Manager Contact (email only)

For more information about or to bid on a project listed below, please click on the project manager's name to send an email.
Projects Open for Bid - updated 6/1/17

Gov. Bill & Vara Daniel Historic Village - clearing grass, building short retaining wall, etc.
Project Manager: Andy Trimble

Bill Daniel Student Center - Student Activities Office Renovations
Project Manager: Brandon Martin

Waco Hall - 2nd Floor Lounge Renovations
Project Manager: Brandon Martin

McLane Student Life Center - Replacing glass at the front counters of the Health Center
Project Manager: Brandon Martin

Bill Daniel Student Center - Adding a glass wall to the Baylor Radio space
Project Manager: Brandon Martin

Bill Daniel Student Center - Turn the Loessin Room into a practice dance studio
Project Manager: Brandon Martin

Bill Daniel Student Center - Replace 2nd floor family restroom tile with black slate
Project Manager: Brandon Martin

Waco Hall - Install 3 or more synchronized LED digital clocks in various places
Project Manager: Brandon Martin

1845@Memorial - Add 5 drop down electrical outlets to Memorial Kitchen
Project Manager: Brandon Martin

Marrs McLean Gym - Renovate room 126 to include a new Cell Culture Lab
Project Manager: Brandon Martin

McLane Student Life Center - Renovations to the Wellness Center
Project Manager: Brandon Martin

Jesse H. Jones Library - Lighting Protection Issues
Project Manager: Derick Kerbyson

Poage Library - Exit Signs - Average Density Renewal
Project Manager: Derick Kerbyson

Clifton Robinson Tower - Maintain supply and refill umbrella bag station on the 1st floor
Project Manager: Derick Kerbyson

Moody Library - Repair dock area damage
Project Manager: Derick Kerbyson

Armstrong Browning Library - Add Inergen Inspection (or fire suppression) system in the book prep room and seal off the window in the book prep room
Project Manager: Derick Kerbyson

Clifton Robinson Tower - Upgrade electrical panel in the 1st floor network/telephone room (includes upgrading system transformer to panel and maintenance-bypass-switch)
Project Manager: Derick Kerbyson

Clifton Robinson Tower - Install water cooler unit on the 6th floor
Project Manager: Derick Kerbyson

Clifton Robinson Tower - Add wall in lobby of 300
Project Manager: Derick Kerbyson

Speight Parking Facility - Cabinets added to the break room of Parking Services
Project Manager: Derick Kerbyson

Clifton Robinson Tower - Take down wallpaper and texture walls, paint, refinish office door, and refinish office floor molding of 620.5 (during the week of June 5-9)
Project Manager: Derick Kerbyson

Allbritton House - Move items
Project Manager: Derick Kerbyson

Poage Library - Install flooring and paint
Project Manager: Derick Kerbyson

Clifton Robinson Tower - Change two-bulb ceiling fixture into four-bulb fixture
Project Manager: Derick Kerbyson

Clifton Robinson Tower - Remove entire front counter in main lobby area
Project Manager: Derick Kerbyson

Clifton Robinson Tower - Remove work station in the lobby
Project Manager: Derick Kerbyson

Moody Library - Change out section of carpet (20' x 30') at the entrance of the Garden Level Study Commons
Project Manager: Derick Kerbyson

Ferrell Center - Change all locks to Sargent system
Project Manager: Gary Emmons

Baylor Science Building - Bird problem on the outside of the E-Wing entrance
Project Manager: Gary Emmons

Marrs McLean Science - Extend existing sidewalks so that they go all the way to the curb (west side of the building closest to South Russell)
Project Manager: Gary Emmons

Community Garden - Assemble and install 10' x 8' steel storage shed
Project Manager: Gary Emmons

Baylor Science Building - Make one or more of the Lab air connections T into the compressed air line in this lab
Project Manager: Jeffrey McLaughlin

Baylor Research & Innovation Collaborative (BRIC) - Possibilities for reducing the temperature in room 1129.02 (i.e. moving the chiller into the adjacent room with fume hood)
Project Manager: Jeffrey McLaughlin

Hooper-Schaefer Fine Arts Center - Install exhaust system in the workroom of the Costume Shop area
Project Manager: Jeffrey McLaughlin

Hooper-Schaefer Fine Arts Center - Move an electrical outlet box in the basement
Project Manager: Jeffrey McLaughlin

Mary Gibbs Jones - Add a liquid CO2 for freezer back-up
Project Manager: Jeffrey McLaughlin

Hankamer - Install a power supply by cable outlet
Project Manager: Jeffrey McLaughlin

Draper- Install a ground bar in the basement telephone switch room to better handle grounding of main telephone system
Project Manager: Jeffrey McLaughlin

Baylor Energy Complex (BEC) - Replace gearbox on cooling tower fan #8
Project Manager: Kenneth Haltom

Baylor Energy Complex (BEC) - Replace or repair gearbox on cooling tower fan #9
Project Manager: Kenneth Haltom

Baylor Energy Complex (BEC) - Replace or repair gearbox on cooling tower fan #1
Project Manager: Kenneth Haltom

Baylor Research & Innovation Collaborative (BRIC) - Put the BRIC entrance and exit gates on emergency (generator) power
Project Manager: Scott Jones

Baylor Research & Innovation Collaborative (BRIC) - Put the BRIC card readers on emergency (generator) power
Project Manager: Scott Jones

Rogers Engineering & Computer Science - Change 104 from a classroom (remove existing tables and tiered layout; add rollup door in place of existing full length windows; remove carpet and replace with something else; add power panel for additional needs; add windows into space from hallway)
Project Manager: Scott Jones

Goebel Building - Replace Mechanical Room door
Project Manager: Scott Jones

Paul L. Foster Campus for Business & Innovation - Add lighting button panel to control the Atrium lights (10-button type)
Project Manager: Scott Jones

Hankamer - Add solid window blind to cover window(s) in H360.12
Project Manager: Scott Jones

Roxy Grove - Add new standard white window blinds for a 60" x 40" window in a faculty member's office
Project Manager: Scott Jones

Rogers Engineering & Computer Science - Renovations to the 1st floor Student Lounge (remove the computer workstation tables along the left side; remove the stainless steel column dividers; replace the carpet in the center of the area; move the digital signs from current location to the wall between the 109 doors; replace existing ceiling grid with the standard drop-in tiles similar to the rest of the building; replace vertical blinds)
Project Manager: Scott Jones

Sid Richardson - Install wall cabinets with locks along the wall at the end of the hallway near 193
Project Manager: Scott Jones

Baylor Science Building - Build out A412 for new faculty member
Project Manager: Scott Jones

Paul L. Foster Campus for Business & Innovation - Add metal wall covering (half way up wall) in the service entry
Project Manager: Scott Jones

Engineering Research Annex - Replace Yale digital locks with the CBoard 8400
Project Manager: Shane Howard

Crenshaw Student Foundation Center - Install another card swipe access point to the front doors of the building
Project Manager: Shane Howard

LL Sams Offices - Run cable from south wall to north wall and drill hole in desk for cable to run through
Project Manager: Shane Howard

Physical Plant - Increase number of network drops in the Control Shop and/or add AirBear access point in HVAC Controls Shop
Project Manager: Shane Howard

Martin House - Install coaxial line for both 1st and 2nd floor
Project Manager: Shane Howard

Baylor Energy Complex - Install new security measures as outlined in security audit including bollards, cameras, locks, and access control BEC and Substation
Project Manager: Shane Howard

Goebel Building - Install CBoard card reader and hardware for rooms 107, 113, and 114
Project Manager: Shane Howard

Highers Athletic Complex - Repair (replace or repaint) the flashing at Simpson Center
Project Manager: TJ Jackson

McLane Stadium - Replace drain coming down from Baylor Line handicap section (needs more openings; cannot keep up with heavy rainfall)
Project Manager: TJ Jackson

Renovation on 5th Street between Dutton and MP Daniel per GLS Design
Project Manager: TJ Jackson

Getterman Stadium - Construct an Academic Excellence Plaza
Project Manager: TJ Jackson

Ferrell Center - Refinish main court
Project Manager: TJ Jackson

Change addresses and place on or near the following facilities: Williams Family & Olympic Sport Center, Getterman Indoor Facility, Getterman Stadium, Baylor Ballpark, and Baseball Indoor Practice
Project Manager: TJ Jackson

McLane Stadium - Construct new concrete staircase near Gate C
Project Manager: TJ Jackson

Highers Athletic Complex - Design for the addition of a shower in the Athletic Director's office
Project Manager: TJ Jackson